Data Center Intelligence Hub Data Center Intelligence Hub
Space-Based Data Center Project North America ·

FCC Grants US Authorization for SpaceX Starmind Constellation of 1,000,000 Orbital Compute Modules

FCC approves SpaceX Starmind: 1,000,000 orbital data centre modules with optical links, 15-year licence and debris rules.

RD

Research Desk

· 3 min read

FCC Grants US Authorization for SpaceX Starmind Constellation of 1,000,000 Orbital Compute Modules

The Federal Communications Commission (FCC) has granted SpaceX the first US authorization for a constellation of data centers in orbit, permitting the company to deploy as many as 1,000,000 orbital compute modules under a project named Starmind.

The decision was announced in Washington, and according to the regulator, it is the first time a US authority has approved a space-based data center network at this scale. The FCC states that SpaceX intends to use the constellation to process large volumes of data in orbit before relaying results back to Earth.

Deployment Schedule and License Duration

The license runs for 15 years and carries a staged set of deployment milestones. SpaceX must deploy and operate the project's first satellite by 25 November 2033.

Two years after that date, it must have 10% of the maximum number of authorized satellites up and running, rising to 50% in November 2038. The company is required to deploy the remaining satellites by November 2040. The license term begins on the day SpaceX reports to the FCC that the first satellite is operational.

Optical Links With Radiofrequency Fallback

The order also sets out the technical conditions attached to the authorization. Optical inter-satellite links will serve as the constellation's primary communication method, supplemented by radiofrequency communications in the 18.8–19.3 GHz downlink band and the 28.6–29.1 GHz uplink band.

SpaceX must maintain radiofrequency links as a backup for telemetry, tracking, and command (TT&C), the systems used to monitor and operate satellites remotely. According to the FCC, these backup systems are designed to keep the network operable if the primary optical links fail or are disrupted.

Debris Rules and Superintelligence Rationale

The FCC states that the system operates within the agency's existing orbital debris rules, which govern how satellite operators manage end-of-life spacecraft and collision risk in orbit. The regulator frames the approval as part of a wider effort to expand America's superintelligence computing capacity.

It further states that the project would bring humanity closer to becoming a Kardashev II civilization, a theoretical measure of technological advancement in which a society harnesses the full energy output of its star. The term is heavily associated with the Dyson sphere or swarm concept, a vast number of solar collectors encompassing a star.

Chairman Casts Approval as Compute Leadership Move

Brendan Carr, FCC Chairman, said, "America is leading the world into the era of super intelligence (SI). This action opens a bold new frontier for the computing infrastructure needed to power America's leadership and growth."

"Compute campuses or data centers are essential to sustaining America's leadership in SI. By moving compute capacity beyond Earth, SpaceX and the many competitors working on their own orbital data centers are meeting the moment. This is the kind of American ingenuity that can unite our strengths in space and advanced technology, reinforce our economic leadership, and expand prosperity here at home," he added.

Elon Musk, CEO of SpaceX and Tesla, replied to a post on X by Carr about the announcement, saying, "Much appreciated. This will be a great asset to America and the world."

Further Orbital Data Centre Filings Still Pending

The FCC adds that it is continuing to review additional orbital data center proposals and intends to issue decisions on each case through its regular procedures.

Compute Deals Preceded the Authorization

The authorization follows a series of compute agreements involving SpaceX during 2026.

Google, Alphabet's cloud division, signed a deal worth USD 920 million a month for access to roughly 110,000 Nvidia GPUs through SpaceX, running from October 2026, as it looks to plug its own AI capacity gap while Google Cloud's TPU build-out continues elsewhere.

Anthropic, the Claude developer, agreed in May 2026 to pay SpaceX USD 1.25 billion a month through 2029 for the entire compute capacity of Colossus 1, the Memphis supercomputer xAI built before its merger with SpaceX, to support Claude model training and inference.

Nvidia acted as an anchor investor in an Apollo Global Management financing vehicle worth billions, used to buy GPUs that are then leased to SpaceXSI, underpinning the hardware supply behind SpaceX's Memphis compute sites.

Tagged

FCCSpaceXData Centres in SpaceOrbital Data CentresSatellite InfrastructureAI Computing InfrastructureSpace-Based ComputingHigh-Performance ComputingOptical Inter-Satellite LinksSatellite CommunicationsData Centre Innovation

Live from the tracker

The projects behind these stories

Capacity, capex, stage, contractors and verified contacts for every project we track, updated daily.

SBE - Ports Technology Campus Redevelopment · Ohio, United States · Not disclosed · On-going / Under Construction LAIDLEY - Hyperion Data Center Campus · Louisiana, United States · Not disclosed · On-going / Under Construction FA/TTU - Project Matador AI Data Center Campus · Texas, United States · Not disclosed · Pre-Construction SACIII - Berry Hill Data Center · Virginia, United States · Not disclosed · Planning GS - Donghae Data Center · Gangwon-do, South Korea · 2,400 MW · Pre-Construction NUAI - Lea County Data Center · New Mexico, United States · 7,000 MW · Planning OLV/MCG - Wonder Valley Alberta Data Center · Alberta, Canada · Not disclosed · Design PD - Heartland Industrial Park Data Center Campus · Indiana, United States · Not disclosed · On-going / Under Construction STARGATE - Abu Dhabi Stargate UAE AI Data Center Campus · Abu Dhabi Emirate, United Arab Emirates · Not disclosed · On-going / Under Construction BAM/NEE - Paducah Data Center · Kentucky, United States · 4,600 MW · Planning SBE - Ports Technology Campus Redevelopment · Ohio, United States · Not disclosed · On-going / Under Construction LAIDLEY - Hyperion Data Center Campus · Louisiana, United States · Not disclosed · On-going / Under Construction FA/TTU - Project Matador AI Data Center Campus · Texas, United States · Not disclosed · Pre-Construction SACIII - Berry Hill Data Center · Virginia, United States · Not disclosed · Planning GS - Donghae Data Center · Gangwon-do, South Korea · 2,400 MW · Pre-Construction NUAI - Lea County Data Center · New Mexico, United States · 7,000 MW · Planning OLV/MCG - Wonder Valley Alberta Data Center · Alberta, Canada · Not disclosed · Design PD - Heartland Industrial Park Data Center Campus · Indiana, United States · Not disclosed · On-going / Under Construction STARGATE - Abu Dhabi Stargate UAE AI Data Center Campus · Abu Dhabi Emirate, United Arab Emirates · Not disclosed · On-going / Under Construction BAM/NEE - Paducah Data Center · Kentucky, United States · 4,600 MW · Planning